TADASHI YOSHIMURA ARCHITECTS

吉村理建築設計事務所

一級建築士事務所
〒639-2225 奈良県御所市1203
Tel 0745-62-1353
e-mail ktmrd123@ybb.ne.jp
HP  www4.kcn.ne.jp/~knetway

大阪事務所
〒544-0032 大阪市生野区中川西1-22-11

>Concept
>Diary  NEW!
>Process
>Works
>Profile
>Contact
>無料サポート
>仕事の取り組み方
>耐震診断
>住まいづくり基礎知識 

吉村理建築設計事務所は、奈良・大阪を拠点にして関西(奈良・大阪・京都・滋賀・兵庫・和歌山)を中心に活動している一級建築士事務所です。安心できる美しい構造体と、自然エネルギーを積極的に利用した心地よい建物づくりのお手伝いを致します。お気軽にご相談下さい。

>ファーストプラン(お試し設計サービス)無料です。打ち合わせの雰囲気や計画案を確認してから、ご依頼いただくかどうかご判断できます。

>オープンハウス情報
設計依頼をご検討の方で古民家を再生した住居「花内屋リノベーション」をご覧になりたい方は、お気軽に御連絡下さい。

RSS表示パーツ

>Publication

Wooden Block House is featured in JA89spring2013
(2013.3.11)NEW!

Tadashi Yoshimura Architects has been published in 'Chilchinbito 73'
(2012.9.11)

Hanauchi-ya renovation is featured
in JuutakuKenchiku No.435
(2012.8.18)

Hanauchi-ya renovation is featured
in Zmagazine2012/07
(shanghai)(2012.7.9)

Hanauchi-ya renovation is featured
in DECO+
(interior design magazine in Taiwan) (2012.4.7)

Hanauchi-ya renovation is featured
in INTERIOR
(interior design magazine in Taiwan) (2012.2.14)

Hanauchi-ya renovation
(Wood Old House) is featured
in Dezeen (2012.2.8)

wohdezeen

Hanauchi-ya renovation
(Wood Old House) is featured
in Arch Daily (2011.12.31)

Wood Old House is featured
in gooood.hk (2011.12.31)

WBH is featured in 
2011Taiwan Designers' Week(2011.10.10)

designersweek

WBH is featured in BONYTT
(design website in Norway) (2011.8.31)

bonytt

WBH is featured in 
The big issue  Aug.2011
(design magazine in Taiwan) (2011.8.8)
  

aym

WBH is featured in 
The Bund No. 449
(weekly magazine of Shanghai)
(2011.8.7)
 

aym

WBH is featured in archeb
(Israel architecture and design website)(2011.7.15)

aym

WBH is featured in Aym
(spanish architecture website)(2011.7.12)

aym

WBH is featured in Architecture Lab architecture and urban design magazine
(Beirut -lebanon) (2011.7.6)
 

lab

Wooden Block House is featured in gooood (china) (2011.7.3) 

gooood

Wooden Block House is featured in dezeen (design  website) 
(2011.6.24)
 

arch dialy

Wooden Block House is featured in Arch daily(architecture web)
(2011.6.24)

arch dialy

Wood Block Houseが「ディテール
185 2010-JULY」(彰国社)
に掲載されました。(2010.06.17) 

detail

Wood Block School


学校 鳥瞰図